At SunLuner, quality control should be aligned with the specifications agreed for each order and the intended application of the material. From incoming material checks to finished-roll verification, the focus is on identifying potential discrepancies, checking products against applicable requirements and helping customers receive materials that match their orders.
Incoming Material Inspection
Before production, relevant material information should be checked against purchasing requirements to help identify discrepancies before they affect the finished fabric.
Depending on the material and the checks confirmed by the factory, incoming inspection may cover:
Material identification:
Checking material names, types and supplier information against purchasing requirements.
Label and packaging checks:
Verifying incoming labels and inspecting packaging for visible damage or abnormalities.
Document review:
Checking applicable raw material documents against the requirements for the material being supplied.
Additional material testing:
Where such tests are performed, relevant properties can be checked using the applicable methods and acceptance criteria.
In-Process Inspection
During production, checks at relevant stages can help identify changes in fabric condition or deviations from the agreed specifications before the material proceeds further.
The specific checkpoints depend on the product being manufactured. They may include monitoring relevant production parameters and checking fabric characteristics against the applicable requirements.
When a deviation is identified, the response should follow the factory's established handling process. This includes determining whether the affected material or production run requires further inspection, adjustment or review before production continues.
Finished Product Inspection
Finished-roll inspection helps verify whether the supplied material matches the requirements agreed for the order.
Relevant checks may include:
Appearance:
Visible stains, damage or other noticeable surface abnormalities.
01
Fabric weight:
GSM or other agreed measures of fabric weight, where measured.
02
Dimensions:
Fabric width, roll length and roll diameter, according to the order requirements and applicable measurement methods.
03
Roll condition:
Winding condition, fabric edges and visible roll damage.
04
Material performance:
Absorbency, strength or other performance properties, where testing is performed and applicable criteria have been established.
05
Traceability and Nonconformity Handling
When a quality concern arises, identifying the affected material and understanding the nature of the discrepancy are important first steps.
Where the relevant records are maintained, traceability information may include production dates, batch identification, raw material records, inspection results and order details. These records can help establish the relationship between the material supplied and its production history.
For identified nonconformities, the handling process should follow the factory's actual procedures. Depending on the issue, this may involve identifying and separating affected material, investigating the cause, determining corrective action and recording the outcome.
Pre-Shipment Verification
Before dispatch, the finished goods should be checked against the relevant order and delivery requirements.
Depending on the established procedure, pre-shipment verification may include checking product identification and labeling, confirming roll quantities against the order, inspecting packaging condition and packing requirements, and verifying applicable product specifications and inspection status before dispatch.
These checks help ensure that the goods prepared for delivery correspond to the confirmed order details and agreed requirements.
